The purpose of this test is to determine if the walls, floors, ceilings, penetrations and other containment barrier features have adequate integrity to prevent leakage of air from the containment space. Yearly testing is performed by SEA engineering personnel with the assistnace of maintenance representatives to verify the commissioning data so laboratory operations can continue.